IRTUM – Institutional Repository of the Technical University of Moldova

Organizarea lucrărilor de construcție-montaj și managementul resurselor

Show simple item record

dc.contributor.advisor VASCAN, Grigore
dc.contributor.author UNGUREANU, Alexandru
dc.date.accessioned 2024-05-20T08:05:01Z
dc.date.available 2024-05-20T08:05:01Z
dc.date.issued 2024
dc.identifier.citation UNGUREANU, Alexandru. Organizarea lucrărilor de construcție-montaj și managementul resurselor: tz. de master: Programul de studiu: Managementul Proiectelor în Construcții. Cond. şt. VASCAN Grigore. Universitatea Tehnică a Moldovei. Chişinău, 2024. en_US
dc.identifier.uri http://repository.utm.md/handle/5014/27142
dc.description Fişierul ataşat conţine: Rezumat, Abstract, Cuprins, Introducere, Bibliografie. en_US
dc.description.abstract Scopul acestei lucrări este de a forma este de a forma capacitatea de cercetare a unei probleme tehnice, organizatorice sau economice, cu identificarea soluțiilor și prezentarea rezultatelor, trecând prin etapa de documentare și etapa practică, obținând abilități de organizare și producere. Teza este structurată în 4 capitole, în primele 3 examinîndu-se managementul execuției proiectelor de construcție, organizarea execuției proceselor de construcție și metodele de organizare a execuției proceselor de construcție, iar capitolul 4 reprezintă partea practică, incluzând obiectul de studiu și executarea graficului Gantt utilizând metoda succesivă și a lanțului neritmic, astfel observând clar impactul semnificativ al metodei de organizare a lucrărilor asupra duratei totale de construcție. Utilizând metoda tradițională succesivă și un grafic Gantt corespunzător, proiectul a durat 12 luni, datorită naturii sale liniare și secvențiale. Pe de altă parte, când s-a optat pentru metoda lanțului neritmic, eficiența a crescut considerabil, scurtând durata de construcție la doar 5 luni. Această abordare mai dinamică și flexibilă a îmbunătățit sincronizarea activităților, eliminând întârzierile și reducând perioadele de inactivitate. Optimizarea fluxului de muncă și gestionarea eficientă a căilor critice au contribuit la reducerea suprapunerilor de timp. Astfel, alegerea unei metode adecvate de organizare a lucrărilor de construcție, reflectată în graficul Gantt, este crucială pentru succesul și eficiența proiectului. Planificarea atentă, adaptabilitatea și gestionarea corespunzătoare a resurselor sunt elemente esențiale pentru atingerea obiectivelor proiectului într-un timp optim cu forțe minime. Aceasta subliniază importanța evaluării și selecției metodei de organizare a lucrărilor în funcție de specificul proiectului, pentru a maximiza eficiența și a îndeplini obiectivele stabilite. en_US
dc.description.abstract The purpose of this work is to develop the capacity to research a technical, organizational, or economic problem, identify solutions, and present the results, going through the stages of documentation and practical application, thereby gaining organizational and production skills. The thesis is structured into four chapters, with the first three examining the management of construction project execution, the organization of construction process execution, and methods of organizing the execution of construction processes. The fourth chapter represents the practical part, including the study object and the execution of the Gantt chart using both the successive method and the critical chain method, thus clearly observing the significant impact of the work organization method on the total construction duration. Using the traditional successive method and a corresponding Gantt chart, the project lasted 12 months due to its linear and sequential nature. On the other hand, when the critical chain method was adopted, efficiency significantly increased, reducing the construction duration to just 5 months. This more dynamic and flexible approach improved the synchronization of activities, eliminating delays and reducing idle times. Optimizing workflow and efficiently managing critical paths contributed to reducing time overlaps. Therefore, choosing an appropriate method for organizing construction works, reflected in the Gantt chart, is crucial for the success and efficiency of the project. Careful planning, adaptability, and proper resource management are essential elements for achieving project objectives in an optimal time with minimal effort. This underscores the importance of evaluating and selecting the work organization method based on the specifics of the project, to maximize efficiency and achieve the set objectives. en_US
dc.language.iso ro en_US
dc.publisher Universitatea Tehnică a Moldovei en_US
dc.rights Attribution-NonCommercial-NoDerivs 3.0 United States *
dc.rights.uri http://creativecommons.org/licenses/by-nc-nd/3.0/us/ *
dc.subject management al resurselor en_US
dc.subject montaj en_US
dc.subject lucrări de construcție en_US
dc.subject Gantt chart en_US
dc.subject construction-assembly works en_US
dc.subject resource management en_US
dc.title Organizarea lucrărilor de construcție-montaj și managementul resurselor en_US
dc.title.alternative Organization of construction-assembly works and resource management en_US
dc.type Thesis en_US


Files in this item

The following license files are associated with this item:

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivs 3.0 United States Except where otherwise noted, this item's license is described as Attribution-NonCommercial-NoDerivs 3.0 United States

Search DSpace


Browse

My Account