dc.contributor | CÎRLAN, Alexandru | |
dc.contributor | CEBOTARI, Victor | |
dc.contributor | MARIAN, Maria-Liliana | |
dc.contributor | OLARU, Efim | |
dc.contributor.advisor | SÂRBU, Teodor | |
dc.contributor.author | MÎNZA, Alexandru | |
dc.date.accessioned | 2024-06-14T10:28:34Z | |
dc.date.available | 2024-06-14T10:28:34Z | |
dc.date.issued | 2024 | |
dc.identifier.citation | MÎNZA, Alexandru. Bloc locativ cu regim în elevaţie P+5E+M amplasat pe strada Ştefan cel Mare, oraşul Căuşeni: proiect de licență: Programul de studiu: 0732.1-Construcţii Industriale şi Civile. Cond. şt. SÂRBU Teodor. Universitatea Tehnică a Moldovei. Chişinău, 2024. | en_US |
dc.identifier.uri | http://repository.utm.md/handle/5014/27410 | |
dc.description | Fişierul ataşat conţine: Rezumat, Abstract, Cuprins, Concluzii, Bibliografie. | en_US |
dc.description.abstract | Prezentul proiect, este alcătuit din memoriu explicativ, și partea grafică.Memoriul explicativ este structurat pe 7 capitole,concluzii și bibliografie,2 anexe, fiind alcătuit din 101 de pagini format A4. Capitolul I ,, Arhitectura Construcțiilor” este alcătuit din 4 colia A1, unde găsim reprezentat planul general a construcției la scara 1:250, tabelul cu indici tehnico-economici, plan situație, plan parter împreună cu plan etaj, 2 secțiuni prin construcție, una longitudinală, iar cealaltă transversala, care trec prin scara, și fațade. Capitolul II ,, Rezistența Construcțiilor” este expus în 3 coli formatul A1, ce includ desene de cofraj, și detalierea armării elementelor, cu necesar de materiale. În acest capitol a fost efectuat calculul elementelor structurale a clădirii, utilizând metoda elementelor finite, cu ajutorul softului SCAD Office. Capitolul II ,, Geotehnică și fundații ” a fost capitolul unde am determinat și efectuat analiza solurilor, ce vor susține viitoarea construcție, ca rezultat am obținut 2 tipuri de fundații continuie de suprafață, fiind expus în o coală format A1. Capitolul IV ,, Tehnologia Construțiilor ” a fost abortată tema executării infrastructurii construției. Unde au fost expuse soluțiile de executare a lucrărilor de terasament, dar și executarea lucrărilor de betonare și armare a fundațiilor. Capitolul V ,, Organizarea ” a fost capitolul rezervat pentru calculul necesar pentru elaborarea planului general de organizare a șantierului, precum și graficul executării lucrărilor, dar și necesarul forței de muncă. Capitolul VI ,, Economia Construcțiilor ” în cadrul acestui capitol am determinat valoarea, dar și costul devizului pentru viitoarea construție. Capitolul VI ,, Securitatea activității vitale ” a fost capitolul unde am expus măsurile pentru a evita accidentele de muncă, dar și prevenirea lor, pentru a asigura cele mai sigure condiții de muncă pentru muncitori. | en_US |
dc.description.abstract | The project comprises an explanatory memorandum and graphic part. The explanatory memorandum is structured into 7 chapters, conclusions, and bibliography, with 2 appendices, totaling 70 A4 pages. Chapter I, "Construction Architecture," consists of 4 A1 sheets, including the general plan of the construction at a 1:250 scale, the table with technical-economic indices, site plan, ground floor plan together with floor plan, 2 sections through the construction, one longitudinal and the other transversal, passing through the staircase, and facades. Chapter II, "Construction Resistance," is presented on 3 A1 sheets, including formwork drawings and detailing of reinforcement elements with material requirements. In this chapter, structural element calculations were performed using the finite element method with the SCAD Office software. Chapter III, "Geotechnics and Foundations," involved the analysis of soils supporting the future construction, resulting in 2 types of continuous surface foundations, presented on one A1 sheet. Chapter IV, "Construction Technology," addressed the execution of the construction infrastructure, presenting solutions for earthworks, concrete works, and reinforcement of foundations. Chapter V, "Organization," was dedicated to calculating the requirements for developing the site's general organization plan, as well as the work schedule and labor force needs. Chapter VI, "Construction Economics," determined the value and cost of the bill of quantities for the future construction. Chapter VII, "Vital Activity Security," outlined measures to prevent workplace accidents and ensure the safest working conditions for laborers. The bachelor's project is elaborated in accordance with the requirements of the valid normative acts in the Republic of Moldova. | en_US |
dc.language.iso | ro | en_US |
dc.publisher | Universitatea Tehnică a Moldovei | en_US |
dc.rights | Attribution-NonCommercial-NoDerivs 3.0 United States | * |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/3.0/us/ | * |
dc.subject | bloc locativ | en_US |
dc.subject | clădiri de locuit | en_US |
dc.subject | fundații continue | en_US |
dc.subject | general plan | en_US |
dc.subject | structural elements | en_US |
dc.subject | continuous foundation | en_US |
dc.title | Bloc locativ cu regim în elevaţie P+5E+M amplasat pe strada Ştefan cel Mare, oraşul Căuşeni | en_US |
dc.title.alternative | Residential building with a height regime of G+5F+UG located on Ştefan cel Mare Street, in the city of Căuşeni | en_US |
dc.type | Thesis | en_US |
The following license files are associated with this item: